Can I Install A Bath Tub Myself?
Can I Install A Bath Tub Myself?
Blog Article
Everyone has got their private piece of advice about How to Install a Bathtub Yourself.

Setting up a bath tub isn't precisely rocket science, however it does require solid plumbing, woodworking, as well as sometimes, tiling abilities. Changing an old bathtub with a brand-new one is also a moderately hard project. If the old bathtub is conveniently available, the task can move rapidly; if you need to open a wall surface to get rid of the old tub as well as position the brand-new bath tub, the task is a lot harder. In either instance, the project is within a house handyman's abilities, although you will certainly require a helper to leave the old bathtub and also set in the brand-new one. See to it you have qualified on your own for the work and are comfortable trying it. As opposed to hiring a professional to take control of a halfway-completed task, it is better to consider employing one before you begin. Possibilities are you might require a specialist plumber to make tube links.
This short article will help you install a new bath tub in your washroom if you have actually currently gotten a new tub and don't require to transform the setup of your previous water pipes.
Your tools and material list should comprise the following:
Removing Old Taps
If you need to change old faucets with brand-new ones as a part of your installment, after that the first thing you need to do is separate the water. After doing so, turn on the faucets to drain pipes any type of water staying in the system. The process of removing the existing faucets can be fairly troublesome due to the restricted accessibility that is usually the instance.
Use a container wrench (crowsfoot spanner) or a faucet tool to undo the nut that connects the supply pipelines to the faucets. Have a fabric ready for the remaining water that will certainly originate from the pipes. Once the supply pipelines have actually been removed, use the very same device to loosen the nut that holds the faucets onto the bath/basin. You will require to quit the single taps from transforming during this process. Once the taps have actually been eliminated, the holes in the bath/basin will need to be cleaned up of any old securing substance.
Before going on to fit the brand-new taps, contrast the pipeline connections on the old faucets to the new faucets. If the old taps are longer than the brand-new faucets, then a shank adapter is needed for the new taps to fit.
Suitable New Taps
If the tails of the new faucets are plastic, then you will need a plastic port to prevent damages to the thread. One end of the connector fits on the plastic tail of the faucet and the various other end offers a connection to the existing supply pipes.
If you require to fit a monobloc, then you will certainly need decreasing couplers, which attaches the 10mm pipeline of the monobloc to the basic 15mm supply pipeline.
Next off, position the tap in the placing opening in the bath/basin making certain that the washers are in location in between the tap and also the sink. Protect the faucet in place with the supplier offered backnut. As soon as the tap is firmly in place, the supply pipelines can be connected to the tails of the taps. The faucets can either be connected by using corrugated copper piping or with normal faucet adapters. The former type needs to be connected to the tap finishes initially, tightening up just by hand. The supply pipes can later on be attached to the other end. Tighten both ends with a spanner after both ends have actually been connected.
Setting up the Bath tub
Using both wood boards under its feet, place the tub in the called for position. The wooden boards are practical in evenly spreading the weight of the bath tub over the area of the boards rather than concentrating all the weight onto four little factors.
The following goal is to make sure that the bath tub is leveled all round. This can be attained by examining the spirit level as well as readjusting the feet on the bathtub up until the level reviews level.
To set up faucets, fit all-time low of the furthest flexible faucet adapter to the appropriate supply pipeline by making a compression join; then do the exact same for the other tap.
Activate the water and also inspect all joints as well as new pipework for leakages and also tighten them if necessary. Fill the bath tub as well as likewise check the overflow electrical outlet and also the regular electrical outlet for leaks.
Finally, repair the bathroom paneling as explained in the supplier's user's manual. Tiling and sealing around the bath tub needs to wait until the bathtub has actually been made use of a minimum of once as this will settle it right into its last setting.
Preparing for the Installment
First of all, the supporting frame provided with the bathroom must be fitted (if needed) according to the maker's directions. Next, fit the taps or mixer to the bathtub. When suitable the faucet block, it is necessary to make certain that if the tap comes with a plastic washer, it is fitted between the bathroom as well as the taps. On a plastic bathroom, it is additionally reasonable to fit a sustaining plate under the faucets system to avoid stress on the bathtub.
Fit the adaptable faucet ports to the bottom of the two taps using 2 nuts and also olives (often supplied with the tub). Fit the plug-hole electrical outlet by smearing mastic filler round the sink electrical outlet hole, and then pass the electrical outlet with the hole in the bath. Use the nut provided by the manufacturer to fit the plug-hole. Check out the plug-hole electrical outlet for an inlet on the side for the overflow pipeline.
Next, fit the end of the flexible overflow pipeline to the overflow electrical outlet. After that, screw the pipe to the overflow face which need to be fitted inside the bathroom. Make certain you make use of every one of the supplied washers.
Attach the catch to the bottom of the waste outlet on the bathtub by winding the string of the waste electrical outlet with silicone mastic or PTFE tape, and screw on the trap to the electrical outlet. Link the bottom of the overflow tube in a similar manner.The bathroom must now prepare to be fitted in its final placement.
Tiling Around the Tub
In the area where the bathroom satisfies the tile, it is essential to secure the joins with a silicone rubber caulking. This is necessary as the installation can move enough to crack an inflexible seal, triggering the water to penetrate the wall surface between the bathroom as well as the tiling, leading to difficulties with moisture and feasible leakages to the ceiling below.
You can pick from a range of coloured sealers to assimilate your fixtures as well as fittings. They are marketed in tubes and cartridges, and also are capable of securing spaces approximately a size of 3mm (1/8 inch). If you have a bigger space to fill up, you can fill it with spins of soaked paper or soft rope. Remember to constantly fill the tub with water before sealing, to enable the movement experienced when the bathtub is in usage. The sealer can break rather early if you do not think about this movement prior to sealing.
Additionally, ceramic coving or quadrant tiles can be utilized to border the bath or shower tray. Plastic strips of coving, which are easy to use and also cut to dimension, are also quickly offered on the marketplace. It is advisable to fit the ceramic tiles using water-resistant or water-proof adhesive as well as cement.
Bathtub Installation
How Important Is A Bathtub To Your Home?
High-quality baths, showers, and other bathroom updates are necessary when considering a smart investment in your home. It’s a room that you go to every day and one that is constantly being used by guests.The bathroom is one of the top trafficked rooms in a home and also one of the most valuable in terms of home resale.
Install Piping Before Tub
You will be using your existing drain and waste vent system, but pipes required include the hot and cold water supply lines and a pipe leading to a shower head. A mixing valve and shower head are also needed. Air chambers may be required.
Position the Tub
Lower the tub into place so that the continuous flange fits against the wall studs and rests on 1’x4' or 2’x4' supports. Anchor the tub to the enclosure with nails or screws inserted through the flanges into the studs.
NOTE: Remember, bathtubs and shower stalls may require support framing. A bathtub filled with water is extremely heavy, so check building codes and framing support before installing the tub.
Assemble Drain Connections
Assemble the bathtub drain connections by connecting the tub overflow with the tub drain above the trap, not beyond it. The trap will have a compression fitting that screws over the arm of the overflow assembly.
Place a Pipe For the Shower Head
First, locate a brass female threaded winged fitting and attach it to a framing support via a screw or a nail. Then run a pipe up the wall for the shower head. Sweat or solder the other side of the brass fitting to the top of the pipe.
Attaching Hot and Cold Water Lines
Attach your water lines for both hot and cold by sweating these directly into the hot and cold ports of the mixing valve. The mixing valve will be how water enters the tub’s system, not by the pipes themselves.
Install the Spout
Extend a piece of 1/2 inch pipe, or whichever length is specified in the manufacturer’s instructions, for the tub spout. Sweat on a male threaded fitting at the end of the pipe or use a brass nipple of the proper length and a 1/2 inch cap.
NOTE: At this point you should have your rough-in plumbing work inspected before proceeding further.
Check For Leaks
Restore the water pressure and check the drain connection and the supply pipes for any sign of leaking.
estore the Bathroom Wall
Replace the wall with moisture-resistant drywall as a base for your wall covering. Seal the joints between the wall and your new tub with silicone caulk as protection against water seepage.
https://www.berkeys.com/2016/12/02/bathtub-installation-dallas/

I have been very drawn to Tools You Need to Install a New Bathtub and I'm hoping you appreciated the piece. Are you aware of another individual who is excited about the niche? Do not hesitate to share it. Thanks a lot for taking the time to read it.
Request An Appointment
Report this page